Light Duty Angle Tower

Light Duty Angle Tower

The Light Duty Angle Tower is used at 10kV–110kV line angle positions to carry transverse conductor tension and provide structural support for line direction changes.
Send Inquiry

Product Overview

 

The Light Duty Angle Tower is used at 10kV–110kV line angle positions to carry transverse conductor tension and provide structural support for line direction changes.

 

Core Technical Requirements

 

Streamlined with small-profile, low-tonnage steel for effortless single-worker manual portage and rapid crane-free onsite erection
Spatial truss system with diagonal bracing maintains overall stability under 35 m/s extreme wind conditions.
Designed with 1.5× yield strength factor to sustain bidirectional transverse loads at 30° maximum line deviation.

 

Technical Parameters

 

Material Grade

Q255B / Q355B / ASTM A36 / ASTM A572 GR50

Corrosion Protection

Hot-dip galvanizing (ISO 1461 / ASTM A123)

Voltage Level

10kV–110kV

Max Wind Speed

30–35 m/s (standard) / 35–40 m/s (reinforced)

Design Standards

ASCE 10-15 / TIA-222-H / EN 1993 / IEC 60826

Welding Inspection

100% UT / MT

Fasteners

Grade 6.8 / 8.8 high-strength bolts

 

Company Capability & Service

 

Quality Compliance
Certified under ISO 9001. Welding complies with AWS D1.1 and EN 1090. Galvanizing meets ISO 1461 and ASTM A123.

 

Delivery Capability

 

Components are fabricated and packed according to drawings and shipped in installation sequence.
After-Sales Service
24-hour technical response with remote installation guidance and spare parts support.

 

Packaging & Delivery

 

Components are packed by tower segment and shipped according to installation sequence.
Each component has a unique stamped ID matching engineering drawings.
Internal bracing and securing systems are used to prevent transport deformation.

 

FAQ

 

Q: What governs the structural performance of angle towers?

A: Combined transverse wind loads and tension imbalance at angle positions.

Q: How is stability ensured?

A: Through a spatial truss load path and controlled joint stiffness.

Q: How is field mix-up prevented?

A: Each member is stamped and matched to installation drawings.

Q: Lead time and payment terms?

A: 30–40 days delivery, 30% deposit, 70% before shipment or against B/L.

Hot Tags: light duty angle tower, China light duty angle tower manufacturers, suppliers, factory, anchor tower lightning protection system, dead end tower structural steel components, galvanized strain tower, heavy duty angle tower foundation system, transmission line tower for power system residential management development, tubular suspension tower base plate structure

Send Inquiry